Progress Update 02/01/2019

Intermittent breaks in the weather have allowed us to get a few steps closer to the finish line. The following activities have taken place:

  1. Sequence 1 Foundation block have been installed. 

  2. Sequence 2 Foundation Block have been installed.

  3. Sequence 3 Foundation Block have been installed. 

  4. Electrical Slab rough in has continued.

  5. Storm pipe installation has continued. 

  6. Mechanical 4 pipe chiller system installation has begun.